Tsim Ib Tug Choj Crane
video
Tsim Ib Tug Choj Crane

Tsim Ib Tug Choj Crane

Building a bridge eot crane with Grab Bucket is a kind of hoisting machinery, which is a kind of machinery for cyclic and intermittent motion. It has automatic weighing and recording functions, the high working level is suitable for the long-term and uninterrupted work of enterprises such as waste incineration power plants.

  • Kev xa khoom sai
  • Quality Assurance
  • 24/7 Kev Pabcuam Cov Neeg Siv Khoom
Khoom Taw qhia

1. Product Introduction:

 

 

The Building a bridge eot crane with Grab Bucket is with a garbage grab, which is an import equipment in city waste incineration plant. Building a bridge eot crane with Grab Bucket is installed over the garbage pit for garbage charging, transport, mixing and weighing. This Crane can be manual, semi-auto and fully auto type, carrying out automatic grabbing, automatic repeat feeding, automatic repeat dumping, and automatic parking.

 

This Building a bridge eot crane with Grab Bucket belongs to the A5-A8 working class. The rated lifting capacity includes the self-weight of the grab bucket, and the material grabbed by the grab bucket is divided into three types: light, medium and heavy. When used in the open air, with rain-proof equipment and rain-proof equipment, the total weight and wheel pressure of the crane will increase by about 5%.

 

50 ton Eot Crane factory

2. Parameters:

 

5

10

16

20

20

18

22

26

40.1

40.7

41.8

48.6

44.6

45.6

43.2

43.2

93.7

86.4

76

89

89

87.3

87.3

 

Volume(m3)

 

Density(t/m3)


3. Component:

This machine belongs to the heavy-duty (A6) working system, and the lifting capacity includes the self-weight of the grab. Building a bridge eot crane with Grab Bucket is composed of box-shaped bridge frame, cart running mechanism, trolley, grab bucket and electrical equipment, all of which are operated in the control room.

 

The Building a bridge eot crane with Grab Bucket's main structure is made of high-quality steel that can withstand the rigors of heavy lifting while maintaining its integrity over time. Additionally, the crane's components are treated with anti-corrosion coatings that protect against rust and other forms of damage.

 

 

 

Semi-Auto Type:

 

Fully-Auto Type:

 

4. Applicable Environment:

 

 

50 ton Eot Crane for sale

5. Wearing Parts:

 

 

6. How to operate a Building a bridge eot crane with Grab Bucket?

 

 

(1) Grab opening operation: lower the lifting and opening and closing to the appropriate position at the same time, stop the lifting and lowering, close and continue to lower, the grab is gradually opened, and the opening and closing operation is completed.

 

(2) Grab closing operation: Open and close the reel for lifting operation, the upper pulley block of the grab bucket does not move, and the lower pulley block moves upward until the grab teeth of the grab cross and touch each other.

 

(3) Lifting and falling operation of the grab: whether the grab is open or closed, it can be operated to rise or fall. During operation, the lifting and opening and closing of the reel must be at the same time

 

7. Transportation:

50 ton Eot Crane  price

8. Why choose us?

 

Independently conduct over 20 technological flows.

 

 

 

9. Frequently Asked Questions about :

 

(1) Could we buy spare parts in local once they are out of work?

 

(2) Do you provide lift tools?

 

 

Cim npe nrov:

Koj Tseem Yuav Zoo Li

(0/10)

clearall